Overall Rating | Silver |
---|---|
Overall Score | 46.23 |
Liaison | Martín Sánchez Gutiérrez |
Submission Date | June 29, 2024 |
Tecnológico de Monterrey – Campus Chihuahua
IL-46: Electric Vehicle Infrastructure
Status | Score | Responsible Party |
---|---|---|
n/a | / |
Criteria
An institution earns 1 bonus point when at least 5 percent of its public parking spaces are reserved for full battery electric vehicles (BEVs) and/or plug-in hybrid electric vehicles (PHEVs) and equipped with charging stations.
Measurement
Report on the most recent data available from within the previous three years.
An institution that makes its fleet vehicle charging stations available to the public may count those stations toward the total.
Applicability
This credit is optional.
Scoring
Measurement
The information presented here is self-reported. While AASHE staff review portions of all STARS reports and institutions are welcome to seek additional forms of review, the data in STARS reports are not verified by AASHE. If you believe any of this information is erroneous or inconsistent with credit criteria, please review the process for inquiring about the information reported by an institution or simply email your inquiry to stars@aashe.org.