Overall Rating | Gold |
---|---|
Overall Score | 65.69 |
Liaison | Jennifer Kleindienst |
Submission Date | April 5, 2023 |
Wesleyan University
PRE-4: Operational Characteristics
Status | Score | Responsible Party |
---|---|---|
![]() |
N/A |
Steven
Formica Construction Project Coordinator Facilities/Physical Plant |
Endowment size:
Total campus area:
Locale:
IECC climate zone:
Gross floor area of building space:
Floor area of laboratory space:
Floor area of healthcare space:
Floor area of other energy intensive space:
Additional documentation to support the submission :
Energy intensive spaces include 1 data center, 2 dining halls, 1 restaurant, 3 cafes, 2 convenience stores. Wesleyan's health center is not an energy-intensive space.
Land excluded from managed grounds includes the footprint of all buildings, the solar farm at the east side Long Lane parcel, the cross country track at the west side Long Lane Parcel, the field areas in front of Cady Building along Long Lane, the field area along Pine and Wadsworth Street and the sloped area in front of Fauver apartments and Bennet Hall along Pine Street.
The information presented here is self-reported. While AASHE staff review portions of all STARS reports and institutions are welcome to seek additional forms of review, the data in STARS reports are not verified by AASHE. If you believe any of this information is erroneous or inconsistent with credit criteria, please review the process for inquiring about the information reported by an institution or simply email your inquiry to stars@aashe.org.