Overall Rating Gold
Overall Score 65.69
Liaison Jennifer Kleindienst
Submission Date April 5, 2023

STARS v2.2

Wesleyan University
OP-19: Construction and Demolition Waste Diversion

Status Score Responsible Party
Complete 0.32 / 1.00 Roseann Sillasen
Associate Director/Project Manager
Physical Plant - Facilities
"---" indicates that no data was submitted for this field

Construction and demolition materials recycled, donated, or otherwise recovered:
2,069.32 Tons

Construction and demolition materials landfilled or incinerated:
4,496.91 Tons

Percentage of construction and demolition materials diverted from the landfill or incinerator through recycling, donation and/or other forms of recovery:
31.51

A brief description of programs, policies, infrastructure investments, outreach efforts, and/or other factors that contributed to the diversion rate for construction and demolition waste:

C&D policies are referenced in Major Maintenance Front End Documents; Specification Section 01505 - CONSTRUCTION WASTE MANAGEMENT:

PART 1 – GENERAL

1.1 SUMMARY
A. Section includes: Administrative and procedural requirements for construction waste management activities.
B. Related sections: all sections in the project manual noted in Divisions 2, 3, 4, 5, 6, 7, 8, 9, 10, 11, 12, 13, 14, 15, 16, 17, _33

1.2 DEFINITIONS
A. Construction, Demolition, and Land clearing (CDL) Waste: Includes all non-hazardous solid wastes resulting from construction, remodeling, alterations, repair, demolition and landclearing. Includes material that is recycled, reused, salvaged or disposed as garbage. Contractor shall provide a credit to the Owner in their bid price for materials recycled for cash. See Section 3.2.
B. Salvage: Recovery of materials for on-site reuse, or offsite sale or donation to a third party.
C. Reuse: Making use of a material without altering its form. Materials can be reused on-site or reused on other projects off-site. Examples include, but are not limited to the following: Grinding of concrete for use as subbase material; Chipping of land clearing debris for use as mulch.
D. Recycling: The process of sorting, cleaning, treating, and reconstituting materials for the purpose of using the material in the manufacture of a new product. Contractor shall identify in their bid credit to the Owner for recycled materials.
E. Source-Separated CDL Recycling: The process of separating recyclable materials in separate containers as they are generated on the job-site. The separated materials are hauled directly to a recycling facility or transfer station.
F. Co-mingled CDL Recycling: The process of collecting mixed recyclable materials in one container on-site. The container is taken to a material recovery facility where materials are separated for recycling.
G. Approved Recycling Facility: Any of the following:
1. A facility that can legally accept CDL waste materials for the purpose of processing the materials into an altered form for the use of recycling.
2. Material Recovery Facility: A general term used to describe a waste-sorting facility.
a) Mechanical, hand-separation, or a combination of both procedures, are used to recover recyclable materials.
b) Co-mingled containers are to be taken to a material recovery facility with at least a 50% co-mingled recycling rate.

1.3 SUBMITTALS
A. Waste Management Plan: Submit plan within seven days of date established for the Notice to Proceed.
B. Waste Management Report: Submit report concurrent with the final Application for Payment.

1.4 PERFORMANCE REQUIREMENTS
A. General: Material from demolition projects shall be recycled or reused whenever practicable. Divert a minimum of 50% CDL waste, by weight, from the landfill by one, or a combination of the following activities:
1. Salvage
2. Reuse
3. Source-Separated CDL Recycling
4. Co-mingled CDL Recycling
B. CDL waste materials that can be salvaged, reused or recycled include, but are not limited to, the following:
1. Asphalt
2. Asphalt shingles (11%)
(1) Connecticut Shingle Recyclers: (1) Babylon Recycling LLC (2) Incorporated Industries Recycling Center (3) The Asphalt Roof Recycling Center (Asphalt Roofing Recycling Center) (4) United Recycling of Shelton
3. Concrete
4. Metals
5. Window glass
6. Wood
7. Carpet
8. Field office waste, including office paper, aluminum cans, glass, plastic, and office
cardboard: Complete Waste Removal & Recycling Services
C. See salvage detail items identified by Owner specific to project scopes.

1.5 QUALITY ASSURANCE
A. Regulatory Requirements: Conduct construction waste management activities in accordance with the State of Connecticut EPA, Middletown Municipal Code and all other applicable laws and ordinances.
B. Preconstruction Conference: Review methods and procedures related to waste management including, but not limited to, the following:
1. Review and discuss waste management plan including responsibilities of Waste Management Coordinator.
2. Review requirements for documenting quantities of each type of materials that will be salvaged, recycled or disposed of as waste.
3. Review and finalize procedures for materials separation and verify availability of containers and bins needed to avoid delays.
4. Review procedures for periodic waste collection and transportation to recycling and disposal facilities.
5. Review waste management requirements for each trade.
6. Review and distribution of the following publications and programs. For additional
information on collection procedures and recycling regulations, contact the Middletown Sanitation Main Office at (860) 638-4850:
a) Sanitation District Garbage and Recycling Collection Information Middlesex County. Call (860) 638-4850 for extra copies.
b) Recycling Coordinator at (860) 638-4850

1.6 WASTE MANAGEMENT PLAN
A. General: Develop plan consisting of waste types, quantity by weight, methods of disposal, handling and transportation procedures. Include separate sections in plan for demolition and construction waste.
B. Organize the waste management plan in accordance with the sample plan included at end of Part 3, including the following information:
1. Types and estimated quantities, by weight, of CDL waste expected to be generated during demolition and construction.
2. Proposed methods for CDL waste salvage, reuse, recycling and disposal during demolition including, but not limited to, one or more of the following:
a) Contracting with a deconstruction specialist to salvage materials generated,
b) Selective salvage as part of demolition contractor’s work,
c) Reuse of materials on-site or off-site sale or donation to a third party.
3. Proposed methods for salvage, reuse, recycling and disposal during construction including, but not limited to, one or more of the following:
a) Requiring subcontractors to take their CDL waste to a recycling facility,
b) Contracting with a recycling hauler to haul recyclable CDL waste to an approved recycling or material recovery facility,
c) Processing and reusing materials on-site
d) Self-hauling to a recycling or material recovery facility.
e) Name of recycling or material recovery facility receiving each of the CDL wastes.
f) Handling and Transportation Procedures: Include method that will be used for separating recyclable waste including sizes of containers, container labeling, and designated location on Project site where materials separation will be located.

1.7 WASTE MANAGEMENT REPORT
A. Waste Management Report: Submit a cumulative waste management report on the form included at end of Part 3 with the final Application for Payment with the following attachments:
1. A record of the type and quantity, by weight, of each material salvaged, reused, recycled or disposed.
2. Total quantity of waste recycled as a percentage of total waste.
3. Disposal Receipts: Copy of receipts issued by a disposal facility for CDL waste that
is disposed in a landfill.
4. Recycling Receipts: Copy of receipts issued by approved recycling facilities for co-mingled materials. Include weight tickets from the recycling hauler or material recovery facility and verification of the recycling rate for co-mingled loads at the facility.
5. Salvaged Materials Documentation: Types and quantities, by weight, for materials salvaged for reuse on site, sold or donated to a third party.

PART 2 - PRODUCTS (Not Used)

PART 3 - EXECUTION

3.1 CONSTRUCTION WASTE MANAGEMENT, GENERAL
A. Provide containers for CDL waste that is to be recycled clearly labeled as such with a list of acceptable and unacceptable materials. The list of acceptable materials must be the same as the materials recycled at the receiving material recovery facility or recycling processor.
B. The collection containers for recyclable CDL waste must contain no more than 5% on- recyclable material by volume.
C. Provide containers for CDL waste that is disposed in a landfill clearly labeled as such.
D. Use detailed material estimates to reduce risk of unplanned and potentially wasteful cuts.
E. To the greatest extent possible, include in material purchasing agreements a waste reduction provision requesting that materials and equipment be delivered in packaging made of recyclable material, that they reduce the amount of packaging, that packaging be taken back for reuse or recycling, and to take back all unused product. Insure that subcontractors require the same provisions in their purchase agreements.
F. Conduct regular visual inspections of dumpsters and recycling bins to remove contaminants.

3.2 SOURCE SEPARATION
A. General: Separate recyclable materials from CDL waste to the maximum extent possible. Separate recyclable materials by type.
1. Provide containers, clearly labeled, by type of separated materials or provide other storage method for managing recyclable materials until they are removed from Project site.
2. For recyclables to be credited to the Owner, separate items as listed and provide additional containers as required:
a. Copper
b. Brass
c. Stainless steel
d. Aluminum
3. Stockpile processed materials on-site without intermixing with other materials. Place, grade, and shape stockpiles to drain surface water. Cover to prevent windblown dust.
4. Stockpile materials away from demolition area. Do not store within drip line of remaining trees.
5. Store components off the ground and protect from weather.

3.3 CO-MINGLED RECYCLING
A. General: Do not put CDL waste that will be disposed in a landfill into a co-mingled CDL waste recycling container.

3.4 REMOVAL OF CONSTRUCTION WASTE MATERIALS
A. Remove CDL waste materials from project site on a regular basis. Do not allow CDL waste to accumulate on-site.
B. Transport CDL waste materials off Owner's property and legally dispose of them.
C. Disposal companies other than Dainty Waste Disposal must be prequalified by WESU.
D. Disposal company must be DEP approved.
E. Burning of CDL waste is not permitted.

END OF SECTION


Website URL where information about the institution’s C&D waste diversion efforts is available:
---

Additional documentation to support the submission:
Data source(s) and notes about the submission:

The information presented here is self-reported. While AASHE staff review portions of all STARS reports and institutions are welcome to seek additional forms of review, the data in STARS reports are not verified by AASHE. If you believe any of this information is erroneous or inconsistent with credit criteria, please review the process for inquiring about the information reported by an institution or simply email your inquiry to stars@aashe.org.