Overall Rating Silver - expired
Overall Score 53.05
Liaison Dedee DeLongpre Johnston
Submission Date Jan. 28, 2011
Executive Letter Download

STARS v1.0

Wake Forest University
OP-1: Building Operations and Maintenance

Status Score Responsible Party
Complete 0.53 / 7.00 Mike Draughn
Director, Maintenance and Utilities Services
Facilities & Campus Services
"---" indicates that no data was submitted for this field

Total building space that meets "Eligible Buildings Criteria":
2,605,170 Gross square feet

Building space that is maintained in accordance with sustainable building operations and maintenance guidelines or policies but is NOT certified under LEED for Existing Buildings: O&M:
521,034 Gross square feet

Building space that is LEED for Existing Buildings: O&M Certified :
0 Gross square feet

Building space that is LEED for Existing Buildings: O&M Silver certified :
0 Gross square feet

Building space that is LEED for Existing Buildings: O&M Gold certified :
0 Gross square feet

Building space that is LEED for Existing Buildings: O&M Platinum certified :
0 Gross square feet

The website URL where a copy of the institution's guidelines or policies for sustainable building operations and maintenance is available :
---

An electronic copy of the guidelines or policies:
The date(s) the policies or guidelines were adopted:
January 2011

A brief description of how the institution ensures compliance with sustainable building operation and maintenance guidelines and policies:

Wake Forest University has continued to expand its efforts to improve performance in operations and maintenance of existing buildings. We have not pursued LEED-EB certification of any buildings at this time; however, several campus-wide and building-specific programs addressed in LEED-EB are complete or in various stages of completion.

Campus-wide Initiatives include:

• Sustainable sites:
o Zip car Program
o New Bike Racks
o Expanded Shuttle routes
o Tree Policy
• Materials & Resources
o Improved Procurement Policies
o Waste Reduction & Recycling position created
o Green Cleaning Chemicals
• Indoor Environmental Quality
o IAQ sampling for troublesome areas can be done internally through an Aircuity air monitoring instrument to provide thorough IAQ analysis and reporting capabilities
o Campus Smoke Free Policy was recently implemented

Building Level Initiatives Include:

• Water Efficiency – From our efforts listed below, the university has realized greater than 17% reduction from the baseline year to FY 2010.
o During the summer of 2010, a potable water sub-metering program was completed and will sub-meter 93% of our campus square footage.
o Standards for reduced flow fixtures have been set for new buildings and modernizations: ½ gpm faucets, 1/8 gpf urinals, dual flush toilets, and 1.5 gpm showerheads: (From our standards and the efforts listed below, the university has realized greater than 25% reduction in water consumption in each of the buildings upgraded.
o Showerheads have been changed out in all residence halls to low-flow fixtures.
o Other fixture upgrades are complete in approximately half of the residence halls and 15% of overall space.
o Cooling Tower Water Management – Chiller Plants have been upgraded with conductivity meters to automate bleed control.
• Energy and Atmosphere - From our efforts listed below, the university has realized greater than 10% reduction in electrical consumption and a greater than 14% reduction in natural gas and oil consumption from the baseline year to FY 2010.
o Maintenance Practices – where feasible, incandescent bulbs have been replaced with CFLs. CRLs are standard replacement bulbs as incandescents burn out.
o Operating Hours have been instituted in our academic and administrative buildings with temperature setbacks occurring during unoccupied periods.
o An aggressive Winter Break setback program was instituted to reduce setpoints to 55 degrees over the extended winter break period.

• Renewal Dollars & Energy Programs
o Chemistry – Demand-based Ventilation, Heat Reclaim, and updated controls were installed during the renewal of the laboratory exhaust and make-up airs systems.
o Recent Lighting Upgrades were completed in approx. 25% of academic and administrative buildings, including occupancy sensors, T12 to T8 conversions, and incandescent to CFL replacements.
o Multi-phase Winston Hall (Biology) AHU replacements underway will renew mechanical systems, upgrade controls, and improve efficiency as well as comfort for the occupants.
o Scales Fine Arts Building Retro-commissioning is underway and is expected to become a pilot program for future efforts.
o Upgrades to our Building Automation System and Preventive Maintenance Programs have provided better tools for our technicians and improved the reliability and comfort of our systems.
o Over 97% of our electric usage is sub-metered and electronically monitored at the building level.
o Steam Plant Controls have been upgraded with improvements to plant efficiency and monitoring capabilities.
o Indoor Environmental Quality
o Green Cleaning Chemicals have been introduced across campus and a new cleaning methodology (OS1) is in place in 15% of our building area and is being expanded over time.


Data source(s) and notes about the submission:
---

The information presented here is self-reported. While AASHE staff review portions of all STARS reports and institutions are welcome to seek additional forms of review, the data in STARS reports are not verified by AASHE. If you believe any of this information is erroneous or inconsistent with credit criteria, please review the process for inquiring about the information reported by an institution or simply email your inquiry to stars@aashe.org.