Overall Rating Gold - expired
Overall Score 73.04
Liaison Troy Goodnough
Submission Date March 30, 2018
Executive Letter Download

STARS v2.1

University of Minnesota, Morris
OP-5: Building Energy Consumption

Status Score Responsible Party
Complete 2.74 / 6.00 Troy Goodnough
Sustainability Director
Office of Sustainability
"---" indicates that no data was submitted for this field

Part 1

This credit is based on energy inputs from offsite sources and electricity produced by onsite renewables. When the institution purchases one fuel and uses it to produce heat and/or power, you should enter only what is purchased. For example, if the institution purchases natural gas to fuel a CHP system and produce steam and electricity, only the purchased natural gas should be reported.

Figures needed to determine total building energy consumption:
Performance Year Baseline Year
Grid-purchased electricity 10,881 MMBtu 26,799 MMBtu
Electricity from on-site renewables 16,800 MMBtu 7,089 MMBtu
District steam/hot water (sourced from offsite) 106,520 MMBtu 94,238 MMBtu
Energy from all other sources (e.g., natural gas, fuel oil, propane/LPG, district chilled water, coal/coke, biomass) 0 MMBtu 0 MMBtu
Total 134,201 MMBtu 128,126 MMBtu

Start and end dates of the performance year and baseline year (or 3-year periods):
Start Date End Date
Performance Year Jan. 1, 2017 Dec. 31, 2017
Baseline Year Jan. 1, 2005 Dec. 31, 2005

A brief description of when and why the building energy consumption baseline was adopted (e.g. in sustainability plans and policies or in the context of other reporting obligations):
---

Gross floor area of building space:
Performance Year Baseline Year
Gross floor area of building space 80,069.94 Gross square meters 89,304.59 Gross square meters

Source-site ratio for grid-purchased electricity:
3.14

Total building energy consumption per unit of floor area:
Performance Year Baseline Year
Site energy 1.68 MMBtu per square meter 1.43 MMBtu per square meter
Source energy 2.23 MMBtu per square meter 2.29 MMBtu per square meter

Percentage reduction in total building energy consumption (source energy) per unit of floor area from baseline:
2.40

Part 2 

Degree days, performance year (base 65 °F / 18 °C):
Degree days (see help icon above)
Heating degree days 4,571.67 Degree-Days (°C)
Cooling degree days 230.56 Degree-Days (°C)

Floor area of energy intensive space, performance year:
Floor Area
Laboratory space 7,385.79 Square meters
Healthcare space 0 Square meters
Other energy intensive space

EUI-adjusted floor area, performance year:
99,653.89 Gross square meters

Building energy consumption (site energy) per unit of EUI-adjusted floor area per degree day, performance year:
86.55 Btu / GSM / Degree-Day (°C)

Optional Fields 

Documentation (e.g. spreadsheet or utility records) to support the performance year energy consumption figures reported above:
---

A brief description of the institution's initiatives to shift individual attitudes and practices in regard to energy efficiency (e.g. outreach and education efforts):
---

A brief description of energy use standards and controls employed by the institution (e.g. building temperature standards, occupancy and vacancy sensors):
Our Invensys Energy Management System controls the heating, air conditioning, air handler & heating pump start/stop sequence in most buildings automatically as outside/inside temperatures and time of day dictate.

A brief description of Light Emitting Diode (LED) lighting and other energy-efficient lighting strategies employed by the institution:
Lights in the NORTH and WEST parking lots are LEDs and dark-sky compliant.

A brief description of passive solar heating, geothermal systems, and related strategies employed by the institution:
---

A brief description of co-generation employed by the institution, e.g. combined heat and power (CHP):
Our on-site biomass gasification plant is also combined-heat-and-power. The plant can use natural gas or biomass. Using a 300kW back pressure steam turbine, the plant makes the electricity that helps run the plant.

A brief description of the institution's initiatives to replace energy-consuming appliances, equipment and systems with high efficiency alternatives (e.g. building re-commissioning or retrofit programs):
---

The website URL where information about the programs or initiatives is available:
---

Additional documentation to support the submission:
---

Data source(s) and notes about the submission:
---

The information presented here is self-reported. While AASHE staff review portions of all STARS reports and institutions are welcome to seek additional forms of review, the data in STARS reports are not verified by AASHE. If you believe any of this information is erroneous or inconsistent with credit criteria, please review the process for inquiring about the information reported by an institution or simply email your inquiry to stars@aashe.org.