Endowment size:
499,000,000 US/Canadian $

Total campus area:
736.10 Acres

Locale:
Small town

IECC climate zone:
6 - Cold

Gross floor area of building space:
4,444,546.39 Gross square feet

Floor area of laboratory space:
244,796.44 Square feet

Floor area of healthcare space:
31,654 Square feet

Floor area of other energy intensive space:
249,996 Square feet

Optional Fields

Additional documentation to support the submission :
---

Data source(s) and notes about the submission:
Endowment: This is a combination of the endowments for both the entire University of Maine System (UMS) and for the University of Maine Foundation, which is just for University of Maine at Orono. UMS endowment of 295 million based on http://staticweb.maine.edu/wp-content/uploads/2017/09/MIP-Incl-Endow-Annual-Report-FY17.pdf?ca0c38. The UMaine Foundation endowment of 204 million is from https://umainefoundation.org/wp-content/uploads/2014/07/REPORT-2017-2.pdf Total campus area: This value was obtained from the Facilities Management Engineering Center. The following areas were included in this calculation: the main body of campus, “Frat Row” and all of the maintained UMaine land on the west side of College Ave., 491-495 College Ave., the Edith Patch property, University Park & the associated child care facility properties, Buchanan Alumni & Canada House properties, the Hazardous Waste Facility, all of the roads and recreational trails associated with the main campus and the “Deer Pen” road & complex, and the Witter Farm area. Gross Floor area of building space: This value was obtained from the Facilities Management Engineering Center for the area covered in the Total Campus Area calculation. Floor area of healthcare space: This value was obtained from the Facilities Management Engineering Center for the area covered in the Total Campus Area calculation. Floor area of other energy intensive space: This value was obtained from the Facilities Management Engineering Center for the area covered in the Total Campus Area calculation. Energy intensive spaces include the New Balance student recreation center, Mahaney Dome, Alfond Arena, Wallace pool, Wells Commons, Hilltop Commons, Memorial Union Bear's Den, York Commons, and the data center.

The information presented here is self-reported. While AASHE staff review portions of all STARS reports and institutions are welcome to seek additional forms of review, the data in STARS reports are not verified by AASHE. If you believe any of this information is erroneous or inconsistent with credit criteria, please review the process for inquiring about the information reported by an institution or simply email your inquiry to stars@aashe.org.