Overall Rating | Bronze - expired |
---|---|
Overall Score | 27.74 |
Liaison | Tess Esposito |
Submission Date | Sept. 7, 2011 |
Executive Letter | Download |
University of Dayton
OP-T2-28: Bicycle Plan
Status | Score | Responsible Party |
---|---|---|
0.25 / 0.25 |
"---"
indicates that no data was submitted for this field
None
Has the institution developed a bicycle plan?:
Yes
None
A brief description of the plan:
A plan to develop a bicycle and pedestrian greenway to connect the 5 major sections of our campus is included in our 2008 Master Plan. (p. 38-39) This corridor will connect residential, research, academic, administrative and athletics spaces, and allow for our students and employees to easily access campus from adjacent public bikeways and trails. The plan has been updated to interface with planned city projects which overlap sections of the greenway to the mutual benefit of both projects; a main traffic corridor through our campus is scheduled to be narrowed to slow traffic, and the new configuration will include a bike lane.
None
The website URL where information about the plan is available:
---
Data source(s) and notes about the submission:
---
The information presented here is self-reported. While AASHE staff review portions of all STARS reports and institutions are welcome to seek additional forms of review, the data in STARS reports are not verified by AASHE. If you believe any of this information is erroneous or inconsistent with credit criteria, please review the process for inquiring about the information reported by an institution or simply email your inquiry to stars@aashe.org.