Overall Rating Reporter
Overall Score
Liaison Meghan Johnson-Bey
Submission Date March 6, 2025

STARS v3.0

Towson University
OP-1: Building Design and Construction

Status Score Responsible Party
Complete Reporter Meghan Bennett
Sustainability Specialist
Facilities Management
"---" indicates that no data was submitted for this field

1.1 Percentage of new floor area designed and constructed to green building standards

Total floor area of newly constructed or renovated building space:
113,674 Square meters

Floor area of new building space third party certified to a comprehensive green building standard:
56,522 Square meters

Floor area of new building space third party certified to a less comprehensive green building standard:
0 Square meters

Floor area of new building space built to green building standards, but not third party certified:
52,892 Square meters

List and description of building and renovation projects completed within the previous five years:

1. Glen Dining Renovations (Renovation) (LEED Silver): Completed in 2020, this project was a renovation to a standalone dining facility, which included complete renovations of interior space, building envelope, and MEP systems.

2. New Science Complex (LEED Gold): Completed around January, 2021, this project was a new standalone building containing classrooms, laboratories, and support spaces.

3. Glen Towers Facade Improvements, Building C: Completed in June, 2022, this is one of 4 nearly identical buildings which were renovated to have completely new exterior skin, along with upgraded MEP systems. 

4. Cook Library Third Floor Academic One Stop Shop: Completed in September, 2022, this project was an interior renovation of the existing library to create a "one stop shop", including academic support and staff office spaces.

5. University Union (LEED Gold): Completed in January, 2023, this was a renovation and expansion of the existing Towson University Student Union.

6. Glen Towers Facade Improvements, Building B: Completed in June, 2023, this is one of 4 nearly identical buildings which were renovated to have completely new exterior skin, along with upgraded MEP systems. 

7. 7400 York Road: Completed in June, 2023, this project was an interior renovation of several floors of an existing university building.

8. Glen Towers Facade Improvements, Building A: Completed in June, 2024, this is one of 4 nearly identical buildings which were renovated to have completely new exterior skin, along with upgraded MEP systems. 

9. College of Health Professions (Building): Completed in August, 2024, this project was a new standalone building containing classrooms, simulation facilities, and support spaces for the Towson University Health Professions programs.


If reporting on the institution’s custom green building standards, at least one of the following two fields is also required:

Online location of the institution’s green building standards:
Copy of the institution’s green building standards:
---

The Reporting Tool will automatically calculate the following figure:

Points earned for indicator OP 1.1:
1.96

Optional documentation

Notes about the information provided for this credit:
---

Additional documentation for this credit:
---

The information presented here is self-reported. While AASHE staff review portions of all STARS reports and institutions are welcome to seek additional forms of review, the data in STARS reports are not verified by AASHE. If you believe any of this information is erroneous or inconsistent with credit criteria, please review the process for inquiring about the information reported by an institution or simply email your inquiry to stars@aashe.org.