Overall Rating | Silver - expired |
---|---|
Overall Score | 48.57 |
Liaison | James Gordon |
Submission Date | Dec. 19, 2011 |
Executive Letter | Download |
Thompson Rivers University
OP-T2-18: Energy Metering
Status | Score | Responsible Party |
---|---|---|
0.25 / 0.25 |
Andrew
Pillar Research Analyst IPA |
"---"
indicates that no data was submitted for this field
None
Does the institution meter all energy consumption (electricity, natural gas, purchased steam, etc.) for at least one building?:
Yes
None
A brief description of the metering system:
Fourteen buildings on campus, covering a total of 83% of the building space, currently feature Hydro and Natural Gas meters that are able to measure all energy consumption from these buildings.
None
The website URL where information about the metering system is available:
---
Data source(s) and notes about the submission:
---
The information presented here is self-reported. While AASHE staff review portions of all STARS reports and institutions are welcome to seek additional forms of review, the data in STARS reports are not verified by AASHE. If you believe any of this information is erroneous or inconsistent with credit criteria, please review the process for inquiring about the information reported by an institution or simply email your inquiry to stars@aashe.org.