Overall Rating Silver
Overall Score 49.88
Liaison Karen Marin-Hines
Submission Date Feb. 29, 2024

STARS v2.2

Texas Tech University
OP-5: Building Energy Efficiency

Status Score Responsible Party
Complete 4.91 / 6.00 Karen Marin-Hines
Campus Sustainability Officer
Operations
"---" indicates that no data was submitted for this field

Part 1. Site energy use per unit of floor area

Performance year energy consumption

Electricity use, performance year (report kilowatt-hours):
kWh MMBtu
Imported electricity 162,007,508 Kilowatt-hours 552,769.62 MMBtu
Electricity from on-site, non-combustion facilities/devices (e.g., renewable energy systems) 0 Kilowatt-hours 0 MMBtu

Stationary fuels and thermal energy, performance year (report MMBtu):
MMBtu
Stationary fuels used on-site to generate electricity and/or thermal energy 552,364.60 MMBtu
Imported steam, hot water, and/or chilled water 0 MMBtu

Total site energy consumption, performance year:
1,105,134.22 MMBtu

Performance year building space

Gross floor area of building space, performance year:
10,707,124.54 Gross square feet

Floor area of energy intensive space, performance year:
Floor area
Laboratory space 1,007,781.88 Square feet
Healthcare space 55,791.85 Square feet
Other energy intensive space 0 Square feet

EUI-adjusted floor area, performance year:
12,834,272.00 Gross square feet

Performance year heating and cooling degree days 

Degree days, performance year:
Degree days
Heating degree days 4,208 Degree-Days (°F)
Cooling degree days 2,321 Degree-Days (°F)

Total degree days, performance year:
6,529 Degree-Days (°F)

Performance period

Start and end dates of the performance year (or 3-year period):
Start date End date
Performance period Sept. 1, 2022 Aug. 31, 2023

Metric used in scoring for Part 1

Total site energy consumption per unit of EUI-adjusted floor area per degree day, performance year:
13.19 Btu / GSF / Degree-Day (°F)

Part 2. Reduction in source energy use per unit of floor area

Baseline year energy consumption

STARS 2.2 requires electricity data in kilowatt-hours (kWh). If a baseline has already been established in a previous version of STARS and the institution wishes to continue using it, the electricity data must be re-entered in kWh. To convert existing electricity figures from MMBtu to kWh, simply multiply by 293.07107 MMBtu/kWh.

Electricity use, baseline year (report kWh):
kWh MMBtu
Imported electricity 133,237,452 Kilowatt-hours 454,606.19 MMBtu
Electricity from on-site, non-combustion facilities/devices (e.g., renewable energy systems) 0 Kilowatt-hours 0 MMBtu

Stationary fuels and thermal energy, baseline year (report MMBtu):
MMBtu
Stationary fuels used on-site to generate electricity and/or thermal energy 867,411 MMBtu
Imported steam, hot water, and/or chilled water 438,513 MMBtu

Total site energy consumption, baseline year:
1,760,530.19 MMBtu

Baseline year building space

Gross floor area of building space, baseline year:
8,069,783 Gross square feet

Baseline period

Start and end dates of the baseline year (or 3-year period):
Start date End date
Baseline period Sept. 1, 2009 Aug. 31, 2010

A brief description of when and why the energy consumption baseline was adopted:
---

Source energy

Source-site ratio for imported electricity:
3

Total energy consumption per unit of floor area:
Site energy Source energy
Performance year 0.10 MMBtu per square foot 0.21 MMBtu per square foot
Baseline year 0.22 MMBtu per square foot 0.33 MMBtu per square foot

Metric used in scoring for Part 2

Percentage reduction in total source energy consumption per unit of floor area from baseline:
37.59

Optional Fields 

Documentation to support the performance year energy consumption figures reported above:
---

A brief description of the institution's initiatives to shift individual attitudes and practices in regard to energy efficiency:
---

A brief description of energy use standards and controls employed by the institution:
The University has a goal of reducing the EUI by 2% annually. We utilize the eSight Energy Management System to monitor building performance and
investigate deviations from the standard of operation of the HVAC equipment. All eSight buildings are checked on three times/day, Monday thru Friday to
maintain vigilance over building operations.

A brief description of Light Emitting Diode (LED) lighting and other energy-efficient lighting strategies employed by the institution:
All new construction and renovation work includes LED luminaires, and any failed luminaire is replaced with an LED equipped equivalent.

A brief description of passive solar heating, geothermal systems, and related strategies employed by the institution:
---

A brief description of co-generation employed by the institution:
Lubbock Power & Light operates a sub-station adjacent to the campus that sends steam to the CHACP at no charge. The operation of the sub-station is
intermittent, and has decreased over the last three years.

A brief description of the institution's initiatives to replace energy-consuming appliances, equipment, and systems with high efficiency alternatives:
Create a five-year plan for energy efficiency projects.

Website URL where information about the institution’s energy conservation and efficiency program is available:
---

Additional documentation to support the submission:
---

Data source(s) and notes about the submission:
---

The information presented here is self-reported. While AASHE staff review portions of all STARS reports and institutions are welcome to seek additional forms of review, the data in STARS reports are not verified by AASHE. If you believe any of this information is erroneous or inconsistent with credit criteria, please review the process for inquiring about the information reported by an institution or simply email your inquiry to stars@aashe.org.