Overall Rating Silver - expired
Overall Score 48.81
Liaison Beth Klein
Submission Date Feb. 29, 2012
Executive Letter Download

STARS v1.0

State University of New York at Cortland
Tier2-2: Building Water Metering

Status Score Responsible Party
Complete 0.25 / 0.25 Doug Roll
Energy Manager
Physical Plant
"---" indicates that no data was submitted for this field

None
Does the institution have building-level water consumption meters for at least one building?:
Yes

None
A brief description of the water metering employed:
Makeup Water from the Cortland City Waterworks is metered into the Central Heating Plant using a turbine meter and pulse output to a BMS system. The water usage is tracked so that if there are increases in makeup water the root cause of the increase is determined and corrective actions can be taken. This might be in the form of steam leakage,condensate leakage etc. In addition to this, we have a number of stand alone buildings that we meter and track the water consumption.

None
The website URL where information about the practice is available:
---

Data source(s) and notes about the submission:
---

The information presented here is self-reported. While AASHE staff review portions of all STARS reports and institutions are welcome to seek additional forms of review, the data in STARS reports are not verified by AASHE. If you believe any of this information is erroneous or inconsistent with credit criteria, please review the process for inquiring about the information reported by an institution or simply email your inquiry to stars@aashe.org.