Overall Rating | Silver - expired |
---|---|
Overall Score | 48.81 |
Liaison | Beth Klein |
Submission Date | Feb. 29, 2012 |
Executive Letter | Download |
State University of New York at Cortland
OP-23: Stormwater Management
Status | Score | Responsible Party |
---|---|---|
2.00 / 2.00 |
Nasrin
Parvizi Associate VP for Facilities Management Facilities Management |
"---"
indicates that no data was submitted for this field
None
Does the institution have a policy, plan, and/or strategies to reduce stormwater runoff from new development projects? :
Yes
None
Does the institution have a policy, plan, and/or strategies to reduce stormwater runoff from ongoing campus operations? :
Yes
None
A brief description of the institution's stormwater management initiatives:
1- As a state Agency,SUNY Cortland needs to follow the State Storm Water Prevention Plan (SWPP)for new construction and Storm Water Management System for ll Projects.
1- During last two years the campus has adopted a "No Mow Zone" to reduce watering of grass.
2- Planted wild flower beds to slow down the surface water
3- Our two Artificial turf fields for the main athletic programs are equipped with underground retention storage.
None
The website URL where information about the institution's stormwater management initiatives, plan or policy is available:
---
None
Does the institution have a living or vegetated roof?:
Yes
None
A brief description of the institution's living or vegetated roof:
There are currently three green roofs. The first one was installed five years ago above the Childcare Center between two residence hall towers which overlook the roof. This allows for educational opportunities for students.
The other two are over entrances to two residence halls.
( Fitzgerald and Randall Halls) Plans are in progress for two more projects to be built in 2012.
None
Does the institution have porous paving?:
Yes
None
A brief description of the institution's porous paving:
The Western part of Campus is over the City aquifer,therefore for our Park and Ride lot (lot 281) and the Parking lot at the Professional Studies Building are porous.
None
Does the institution have retention ponds?:
Yes
None
A brief description of the institution's retention ponds:
The West Campus Apartment is next to the Creek. This creek is par of Theughnioga river which collects the storm water in Cortland. The creek was flooded in 2007. Since then and after enlargement of the Route 281, The State Department of Transportation with the assistance of campus provided a dry retention (seasonal) pond to prevent the flooding and capture the storm water.
None
Does the institution have stone swales?:
Yes
None
A brief description of the institution's stone swales:
Campus has provided storm swales as part of parking project that resides above the surrounding neighborhood in order to prevent the flooding.
None
Does the institution have vegetated swales?:
---
None
A brief description of the institution's vegetated swales:
---
None
Does the institution employ any other technologies or strategies for stormwater management?:
Yes
None
A brief description of other technologies or strategies for stormwater management employed:
There are several underground retention storage structures to hold water in order to prevent flooding or fast discharge to the aquifer.
Data source(s) and notes about the submission:
---
The information presented here is self-reported. While AASHE staff review portions of all STARS reports and institutions are welcome to seek additional forms of review, the data in STARS reports are not verified by AASHE. If you believe any of this information is erroneous or inconsistent with credit criteria, please review the process for inquiring about the information reported by an institution or simply email your inquiry to stars@aashe.org.