Overall Rating | Gold |
---|---|
Overall Score | 71.89 |
Liaison | Isabel Savransky |
Submission Date | Nov. 14, 2023 |
Ontario Tech University
PRE-4: Operational Characteristics
Status | Score | Responsible Party |
---|---|---|
N/A |
Isabel
Savransky Sustainability & Asset Planner Office of Campus Infrastructure and Sustainability |
"---"
indicates that no data was submitted for this field
Endowment size:
21,040,428
US/Canadian $
Total campus area:
78.24
Hectares
Locale:
Mid-size city
IECC climate zone:
6 - Cold
Gross floor area of building space:
121,402.97
Gross square meters
Floor area of laboratory space:
16,124.47
Square meters
Floor area of healthcare space:
0
Square meters
Floor area of other energy intensive space:
3,238.32
Square meters
Additional documentation to support the submission :
---
Data source(s) and notes about the submission:
Laboratory space: Clean Energy Research Labs (CERL), Engineering Building, Energy Research Center (ERC), Science Building (UA), Business and IT Building (UB)
UA,UB, ERC: Wet labs
Other Energy Intensive space: Automotive Center of Excellence (ACE) first floor; ACE is a research facility with a climatic wind -40 to +60 degrees C
Total Campus Area: land data
UA,UB, ERC: Wet labs
Other Energy Intensive space: Automotive Center of Excellence (ACE) first floor; ACE is a research facility with a climatic wind -40 to +60 degrees C
Total Campus Area: land data
The information presented here is self-reported. While AASHE staff review portions of all STARS reports and institutions are welcome to seek additional forms of review, the data in STARS reports are not verified by AASHE. If you believe any of this information is erroneous or inconsistent with credit criteria, please review the process for inquiring about the information reported by an institution or simply email your inquiry to stars@aashe.org.