OP-T2-28: Bicycle and Pedestrian Plan
Status | Score | Responsible Party |
---|---|---|
0.25 / 0.25 |
John
Seibert University Architect Physical Facilities |
"---"
indicates that no data was submitted for this field
None
Has the institution developed a bicycle plan?:
Yes
None
A brief description of the plan:
Miami's September 2011 Circulation Master Plan includes a Bicycle Master Plan (BMP). As requested by the project's Steering Committee (which included student, university and city representatives) the BMP recommends the locations and types of off-street, on-street and shared use paths that together provide a continuous network of access to the highest demand on and off campus destinations and housing. The recommendations are to be implemented as funding becomes available for dedicated and/or related projects.
None
The website URL where information about the plan is available:
Data source(s) and notes about the submission:
---
The information presented here is self-reported. While AASHE staff review portions of all STARS reports and institutions are welcome to seek additional forms of review, the data in STARS reports are not verified by AASHE. If you believe any of this information is erroneous or inconsistent with credit criteria, please review the process for inquiring about the information reported by an institution or simply email your inquiry to stars@aashe.org.