Overall Rating | Silver - expired |
---|---|
Overall Score | 52.65 |
Liaison | Audrey McSain |
Submission Date | July 13, 2016 |
Executive Letter | Download |
Lehigh University
OP-24: Construction and Demolition Waste Diversion
Status | Score | Responsible Party |
---|---|---|
0.95 / 1.00 |
Gary
Falasca Director Facilities Services |
"---"
indicates that no data was submitted for this field
None
Construction and demolition materials recycled, donated, or otherwise recovered:
540.38
Tons
None
Construction and demolition materials landfilled or incinerated :
29.74
Tons
None
A brief description of programs, policies, infrastructure investments, outreach efforts, and/or other factors that contributed to the diversion rate for construction and demolition waste:
Rubble (brick, block, asphalt, masonry, etc.) is hauled to a local recycler and crushed into aggregate products. This material is hauled to a quarry where it is processed (crushed and screened) into a variety of fill products (backfill, sub-base, road-base etc.)
Metal is consolidated locally, processed, shipped to a recycler or large consolidator. The
material is shredded and cleaned at the processor before being shipped to a mill where it is forged into new metal products.
Wood waste is taken to a mulch processor where it is ground into mulch and compost products.
This material is used as a fertilizer and in landscaping.
Trash materials include packing foam, fines (dust and very fine waste materials), composite materials, miscellaneous plastics, worker trash and other materials. Trash is disposed of in landfills.
Drywall is hauled to a processor where the material is ground and screened. The separated gypsum is processed into a soil amendment, fertilizer and conditioner. Scrap drywall paper is screened off and used in animal bedding and for other purposes.
Recovered Recyclables are shipped off-site for sorting and recycling. Recovered recyclables included wood, metal, drywall, cardboard, film plastic, rigid plastic, rubble, ceiling tile, carpet and select other materials. These loads are not quantified by type.
Cardboard is consolidated, baled and shipped to a recycler for manufacturing into new paper products.
Plastic waste from the project is commingled with other debris and separated off-site. Plastics are graded by type:
PVC pipe waste is ground and washed into a fill product used in making new PVC pipe.
HDPE spackle buckets, pipe, spools, lids, etc. are ground washed and used in new HDPE
products.
Miscellaneous film plastics (LDPE, PP, HDPE etc.) are baled. This material is shipped
overseas where the plastics are separated by hand and recycled in various methods
depending on type.
PET bottles are consolidated, baled, ground, washed and made into new PET products.
Fiberglass is baled and shipped to a mill where it is recycled into new building products.
PVC is consolidated and hauled to a processor where it is recycled into new vinyl products
Data source(s) and notes about the submission:
Data source from:
CONSTRUCTION WASTE MANAGEMENT PROGRAM
WILLIAMS HALL
FINAL RECYCLING REPORT
The information presented here is self-reported. While AASHE staff review portions of all STARS reports and institutions are welcome to seek additional forms of review, the data in STARS reports are not verified by AASHE. If you believe any of this information is erroneous or inconsistent with credit criteria, please review the process for inquiring about the information reported by an institution or simply email your inquiry to stars@aashe.org.