Overall Rating | Bronze |
---|---|
Overall Score | 34.83 |
Liaison | Katie Wall |
Submission Date | March 24, 2022 |
Lees-McRae College
OP-5: Building Energy Efficiency
Status | Score | Responsible Party |
---|---|---|
0.00 / 6.00 |
James
Leenhouts Facilities Director Facilities |
Electricity use, performance year (report kilowatt-hours):
kWh | MMBtu | |
Imported electricity | 2,174,085 Kilowatt-hours | 7,417.98 MMBtu |
Electricity from on-site, non-combustion facilities/devices (e.g., renewable energy systems) | 0 Kilowatt-hours | 0 MMBtu |
Stationary fuels and thermal energy, performance year (report MMBtu):
MMBtu | |
Stationary fuels used on-site to generate electricity and/or thermal energy | 0 MMBtu |
Imported steam, hot water, and/or chilled water | 34,920 MMBtu |
Total site energy consumption, performance year:
Gross floor area of building space, performance year:
Floor area of energy intensive space, performance year:
Floor area | |
Laboratory space | 6,210 Square feet |
Healthcare space | 4,728 Square feet |
Other energy intensive space | 1,000 Square feet |
EUI-adjusted floor area, performance year:
Degree days, performance year:
Degree days | |
Heating degree days | 90 Degree-Days (°F) |
Cooling degree days | 90 Degree-Days (°F) |
Total degree days, performance year:
Start and end dates of the performance year (or 3-year period):
Start date | End date | |
Performance period | Oct. 1, 2021 | Nov. 1, 2021 |
Total site energy consumption per unit of EUI-adjusted floor area per degree day, performance year:
Electricity use, baseline year (report kWh):
kWh | MMBtu | |
Imported electricity | 2,174,085 Kilowatt-hours | 7,417.98 MMBtu |
Electricity from on-site, non-combustion facilities/devices (e.g., renewable energy systems) | 0 Kilowatt-hours | 0 MMBtu |
Stationary fuels and thermal energy, baseline year (report MMBtu):
MMBtu | |
Stationary fuels used on-site to generate electricity and/or thermal energy | 0 MMBtu |
Imported steam, hot water, and/or chilled water | 34,920 MMBtu |
Total site energy consumption, baseline year:
Gross floor area of building space, baseline year:
Start and end dates of the baseline year (or 3-year period):
Start date | End date | |
Baseline period | Oct. 1, 2020 | Nov. 1, 2020 |
A brief description of when and why the energy consumption baseline was adopted:
Only one month was assessed.
Source-site ratio for imported electricity:
Total energy consumption per unit of floor area:
Site energy | Source energy | |
Performance year | 0.09 MMBtu per square foot | 0.13 MMBtu per square foot |
Baseline year | 0.09 MMBtu per square foot | 0.13 MMBtu per square foot |
Percentage reduction in total source energy consumption per unit of floor area from baseline:
Documentation to support the performance year energy consumption figures reported above:
A brief description of the institution's initiatives to shift individual attitudes and practices in regard to energy efficiency:
Beginning to assess and collect data with STARS.
A brief description of energy use standards and controls employed by the institution:
Centralized HVAC controls with occupied and unoccupied standards to reduce energy consumption.
A brief description of Light Emitting Diode (LED) lighting and other energy-efficient lighting strategies employed by the institution:
LED lighting projects completed across campus. Currently replacing lighting as service life ends and during major renovations. 85% campus lighting is LED.
A brief description of passive solar heating, geothermal systems, and related strategies employed by the institution:
Where economical and grants available installed geothermal wells for athletic facilities. Roofing systems replaced with R22 and roofing type based on AC or no AC in building to reduce energy consumption.
A brief description of co-generation employed by the institution:
None.
A brief description of the institution's initiatives to replace energy-consuming appliances, equipment, and systems with high efficiency alternatives:
During major renovations recommission buildings with high efficiency boilers.
Website URL where information about the institution’s energy conservation and efficiency program is available:
Additional documentation to support the submission:
Data source(s) and notes about the submission:
Was unable to obtain a full year's records of electric consumption so an estimate was obtained:
2021 October - November, 1 month basis
241565 kWh
This number multiplied by 9 months (summer months are low usage months for residence halls)
Total = 2174085
The same estimate was done with the steam plant numbers. 3880 x 9 months = 34920
2021 Yearly cost of electric was $28,518.30
Was unable to obtain a full year's records of electric consumption so an estimate was obtained:
2021 October - November, 1 month basis
241565 kWh
This number multiplied by 9 months (summer months are low usage months for residence halls)
Total = 2174085
The same estimate was done with the steam plant numbers. 3880 x 9 months = 34920
2021 Yearly cost of electric was $28,518.30
The information presented here is self-reported. While AASHE staff review portions of all STARS reports and institutions are welcome to seek additional forms of review, the data in STARS reports are not verified by AASHE. If you believe any of this information is erroneous or inconsistent with credit criteria, please review the process for inquiring about the information reported by an institution or simply email your inquiry to stars@aashe.org.