Overall Rating | Silver - expired |
---|---|
Overall Score | 58.80 |
Liaison | Pamela Dumm |
Submission Date | Jan. 31, 2014 |
Executive Letter | Download |
Jefferson Community and Technical College
OP-T2-45: Building Water Metering
Status | Score | Responsible Party |
---|---|---|
0.25 / 0.25 |
Pamela
Dumm Manager of Business Operations Business Affairs |
"---"
indicates that no data was submitted for this field
Does the institution have building-level water consumption meters for at least one building?:
Yes
A brief description of the water metering employed:
Energy Service Performance Contract Project "ES-24-03” was completed in May 2004. This project included the Downtown, Southwest, and Technical Campuses.
The water conservation metering devices were upgraded to 1 gpm at all points of use except for hose bibs and drinking fountains.
Since then, at the Technical Campus, the college has replaced six of the water fountains with water conserving models. Four of these replacements include bottle filling stations.
The percentage of building space with water metering:
50
The website URL where information about the practice is available:
---
Data source(s) and notes about the submission:
---
The information presented here is self-reported. While AASHE staff review portions of all STARS reports and institutions are welcome to seek additional forms of review, the data in STARS reports are not verified by AASHE. If you believe any of this information is erroneous or inconsistent with credit criteria, please review the process for inquiring about the information reported by an institution or simply email your inquiry to stars@aashe.org.