Overall Rating Gold
Overall Score 71.07
Liaison Julien-Pierre Lacombe
Submission Date March 4, 2022

STARS v2.2

École de Technologie Supérieure
PRE-3: Institutional Boundary

Status Score Responsible Party
Complete N/A Vincent Proulx-Verville
Mr
General Secretariat
"---" indicates that no data was submitted for this field

Institution type:
Doctoral/Research

Institutional control:
Public

A brief description of the institution’s main campus and other aspects of the institutional boundary used to complete this report:
Located in Montreal's Griffintown neighbourhood, ÉTS specializes in applied engineering education, research and technology transfer, training engineers and researchers to be recognized for their practical and innovative approach. It has approximately 10,700 students, including nearly 2,800 at the graduate level (nearly 665 at the doctoral level). Since its creation, it has maintained a unique partnership with the business community and industry, both with large companies and SMEs. For the training of its bachelor's students (and also graduate students in some cases), the cooperative education formula was adopted. ÉTS is also recognized in business for its professional development service, ÉTS formation.

ÉTS only has one campus, with 12 buildings. Those buildings are owned by the university and are located between Saint-Jacques Street, Ann Street, De la Montagne Street and Ottawa Street. The following features have been integrated in the institutional boundary:
Pavillon A
Pavillon B
Pavillon D
Pavillon E (Maison des étudiants)
Résidences phase 1
Résidences phase 2
Résidences phase 3
Résidences phase 4
Pavillon C (Centech St-Jacques)
Pavillon M (Centech Montfort)
Pavillon I (Ingo)
Pavillon G (CTT, AéroÉTS, CDCM)

Which of the following features are present on campus and which are included within the institutional boundary?:
Present? Included?
Agricultural school No No
Medical school No No
Other professional school with labs or clinics (e.g. dental, nursing, pharmacy, public health, veterinary) No No
Museum Yes Yes
Satellite campus No No
Farm larger than 2 hectares or 5 acres No No
Agricultural experiment station larger than 2 hectares or 5 acres No No
Hospital No No

The rationale for excluding any features that are present from the institutional boundary:
ÉTS owns two buildings, which are currently dilapidated and inocuppied. These buildings have been excluded from the institutional boundary because they will not be renovated or delivered in a near futur.

Optional Fields

Additional documentation to support the submission :
---

Data source(s) and notes about the submission:
---

The information presented here is self-reported. While AASHE staff review portions of all STARS reports and institutions are welcome to seek additional forms of review, the data in STARS reports are not verified by AASHE. If you believe any of this information is erroneous or inconsistent with credit criteria, please review the process for inquiring about the information reported by an institution or simply email your inquiry to stars@aashe.org.