Overall Rating | Reporter - expired |
---|---|
Overall Score | |
Liaison | Kathy Dhanda |
Submission Date | March 22, 2012 |
Executive Letter | Download |
DePaul University
OP-T2-18: Energy Metering
Status | Score | Responsible Party |
---|---|---|
Reporter |
John
Zaccari Director of Facilities, LPC Facilities Operations |
"---"
indicates that no data was submitted for this field
None
Does the institution meter all energy consumption (electricity, natural gas, purchased steam, etc.) for at least one building?:
Yes
None
A brief description of the metering system:
Indication –Each campus has a centrally located operator work station. For Lincoln Park it is in the Facilities Operations Building (1050 Building). In the Downtown Campus the central operator work station is Lewis Building engineers office. Seventy five percent of DePaul’s space is centrally controlled with a BAC-Net system.
Description -- The Andover ContinuumTM CyberStation Operator Workstation software includes native BACnet functionality, expanding the reach of CyberStation to the Continuum bCX1 System Controller/BACnet Router, all Continuum MS/TP BACnet controller family
members, and other third-party BACnet controllers. As a BACnet Operator Workstation
(B-OWS), CyberStationTM offers full alarm monitoring, displays and controls all
BACnet-compatible devices on your networks, through a powerful and dynamic
graphical interface.
None
The website URL where information about the metering system is available:
---
Data source(s) and notes about the submission:
---
The information presented here is self-reported. While AASHE staff review portions of all STARS reports and institutions are welcome to seek additional forms of review, the data in STARS reports are not verified by AASHE. If you believe any of this information is erroneous or inconsistent with credit criteria, please review the process for inquiring about the information reported by an institution or simply email your inquiry to stars@aashe.org.