OP-20: Construction and Demolition Waste Diversion

Status Score Responsible Party
Complete 0.93 / 1.00 Allie Schwartz
Assistant Director, Planning and Outreach
Environmental Stewardship, Columbia University Facilities and Operations
"---" indicates that no data was submitted for this field

Construction and demolition materials recycled, donated, or otherwise recovered during the most recent year for which data is available within the previous three years:
1,182.70 Tons

Construction and demolition materials landfilled or incinerated during the most recent year for which data is available within the previous three years:
86.57 Tons

Percentage of construction and demolition materials diverted from the landfill or incinerator through recycling, donation and/or other forms of recovery:
93.18

Optional Fields 

A brief description of programs, policies, infrastructure investments, outreach efforts, and/or other factors that contributed to the diversion rate for construction and demolition waste:
For LEED projects, recycling construction and demolition debris is a priority and Columbia has had success with rates as high as 92.7% for LEED construction recycling. Operations manages all recycling for small projects. General contractor hired for medium projects (pay lump sum so don’t track and don’t divulge hauler info or recycling). Struggle for 0-10,000 GSF projects. Regardless of the size of project sustainability practices are followed when pursuing LEED certification or following LEED guidelines for new projects with a minimum of 50% for one credit and 75% for second credit recycling. Apartment renovations are minimized as the majority are historic buildings. Renovations that are made reuse the infrastructure-walls, ceilings, flooring except when it’s not structurally possible or for health and safety reasons. For instance if a floor is replaced it’s because the floor is usually rotted out and it’s over 100 years old. URLS: http://facilities.columbia.edu/sustainability/greenbuilding#cleanconstruction and http://facilities.columbia.edu/projects

The website URL where information about the programs or initiatives is available:
---

Additional documentation to support the submission:
---

Data source(s) and notes about the submission:
This information is representative of Columbia Manhattanville- Phase II CCJV + Lendlease Construction Waste Management Tracking from 1/1/2017 - 12/31/2017.

The information presented here is self-reported. While AASHE staff review portions of all STARS reports and institutions are welcome to seek additional forms of review, the data in STARS reports are not verified by AASHE. If you believe any of this information is erroneous or inconsistent with credit criteria, please review the process for inquiring about the information reported by an institution or simply email your inquiry to stars@aashe.org.