Overall Rating Silver - expired
Overall Score 52.21
Liaison David Husemoller
Submission Date June 7, 2017
Executive Letter Download

STARS v2.1

College of Lake County
OP-4: Building Design and Construction

Status Score Responsible Party
Complete 1.08 / 3.00 David Husemoller
Sustainability Manager
Facilities
"---" indicates that no data was submitted for this field

Total floor area of newly constructed or renovated building space (include projects completed within the previous five years) :
158,313 Square feet

Certified Projects 

Floor area of newly constructed or renovated building space certified Living under the Living Building Challenge:
0 Square feet

Floor area of newly constructed or renovated building space certified at each level under a rating system for design and construction used by an Established Green Building Council (GBC) :
Certified Floor Area
LEED BD+C Platinum or at the highest achievable level under another rating system 0 Square feet
LEED BD+C Gold or at the 2nd highest level under another 4- or 5-tier GBC rating system 0 Square feet
Certified at mid-level under a 3- or 5-tier GBC rating system for design and construction (e.g. BREEAM, CASBEE, DGNB, Green Star) 0 Square feet
LEED BD+C Silver or at a step above minimum level under another 4- or 5-tier GBC rating system 0 Square feet
LEED BD+C Certified or certified at minimum level under another GBC rating system 0 Square feet

Floor area of newly constructed or renovated building space certified under a non-GBC rating system for design and construction (e.g. Green Globes NC, Certified Passive House):
0 Square feet

Percentage of newly constructed or renovated building space certified under a green building rating system for design and construction:
0

If reporting certified projects, provide:

A brief description of the green building rating system(s) used and/or a list of certified buildings and ratings:
155,921 sf of renovated space in our campus core was opened in the past year, designed to LEED Gold. Certification will not be made official until a complete commissioning.

If reporting uncertified projects, provide:

Uncertified Projects 

Floor area of newly constructed or renovated building space that is NOT certified, but that was designed and constructed in accordance with published green building guidelines and policies:
158,313 Square feet

If reporting published green building guidelines or policies, provide the following:

A copy of the green building guidelines or policies :
---

The green building guidelines or policies:
All new construction and renovation of space will be designed to LEED Silver standards or better.

Do the green building guidelines or policies cover the following?:
Yes or No
Impacts on the surrounding site (e.g. guidelines to reuse previously developed land, protect environmentally sensitive areas, and otherwise minimize site impacts) Yes
Energy consumption (e.g. policies requiring a minimum level of energy efficiency for buildings and their systems) Yes
Building-level energy metering Yes
Use of environmentally preferable materials (e.g. guidelines to minimize the life cycle impacts associated with building materials) Yes
Indoor environmental quality (i.e. guidelines to protect the health and comfort of building occupants) Yes
Water consumption (e.g. requiring minimum standards of efficiency for indoor and outdoor water use) Yes
Building-level water metering No

A brief description of the green building guidelines or policies and/or a list or sample of buildings covered:
Core and Cafe renovation, 59,608 sf, designed to LEED Gold Southlake Chemistry Lab, 2,534 sf, designed to LEED Silver

None
A brief description of how the institution ensures compliance with green building design and construction guidelines and policies:
By seeking LEED ratings, the commissioning process assures us that that our performing at the desired level.

Optional Fields 

The website URL where information about the programs or initiatives is available:
Additional documentation to support the submission:
---

Data source(s) and notes about the submission:
At the time of this May 2017 submission, our new construction has not been yet officially rated by the GBCI with the LEED rating awards. Some buildings have opened on the Grayslake Campus and others are still expected to be complete by August and December 2017.

The information presented here is self-reported. While AASHE staff review portions of all STARS reports and institutions are welcome to seek additional forms of review, the data in STARS reports are not verified by AASHE. If you believe any of this information is erroneous or inconsistent with credit criteria, please review the process for inquiring about the information reported by an institution or simply email your inquiry to stars@aashe.org.