Endowment size:
27,500,000 US/Canadian $

Total campus area:
1,403.19 Acres

Locale:
Large town

IECC climate zone:
3 - Warm

Gross floor area of building space:
3,082,444 Gross square feet

Floor area of laboratory space:
50,978 Square feet

Floor area of healthcare space:
0 Square feet

Floor area of other energy intensive space:
18,974 Square feet

Additional documentation to support the submission :
---

Data source(s) and notes about the submission:

2,731,791 number which is main campus 1,558.505 (main campus including BIT, promontory and A3. This number does not include Student Union. Number was lower than previous STARS report due to updates in "SFDB" report that remove square footage from stadium and buildings that were demolished) and east campus student occupied 513,200.

The square footage for the buildings on the newly acquired Golden Gate University parcel: Oaks Hall Storage Building 690: 5096, Oaks Hall Annex Building 491: 877, Oaks Hall Building 490: 5085)

floor space of Lab I have the 44035 number consisting of 13, 18, 53, 50, 506

Other energy intense the OP8 number are the data server buildings 41 and 41A (4000+3000). Measurement of area for buildings 41 and 41A is based on data from MetaBIM.

Acreage also includes all housing on East Campus (not just student portion, the report completed in 2021 does include East Campus Open Space for the 1st time.


2,731,791 number which is main campus 1,558.505 (main campus including BIT, promontory and A3. This number does not include Student Union. Number was lower than previous STARS report due to updates in "SFDB" report that remove square footage from stadium and buildings that were demolished) and east campus student occupied 513,200.

The square footage for the buildings on the newly acquired Golden Gate University parcel: Oaks Hall Storage Building 690: 5096, Oaks Hall Annex Building 491: 877, Oaks Hall Building 490: 5085)

floor space of Lab I have the 44035 number consisting of 13, 18, 53, 50, 506

Other energy intense the OP8 number are the data server buildings 41 and 41A (4000+3000). Measurement of area for buildings 41 and 41A is based on data from MetaBIM.

Acreage also includes all housing on East Campus (not just student portion, the report completed in 2021 does include East Campus Open Space for the 1st time.

The information presented here is self-reported. While AASHE staff review portions of all STARS reports and institutions are welcome to seek additional forms of review, the data in STARS reports are not verified by AASHE. If you believe any of this information is erroneous or inconsistent with credit criteria, please review the process for inquiring about the information reported by an institution or simply email your inquiry to stars@aashe.org.